references
Overhead-Shuttle FAW VW Chengdu
1 PLC IM151/8-F PN
Shuttle control LJU, communication via PCM-modular
Storage-EMS Hangzhou Tobacco
3 PLC S7-319-F PN/DP
60 Trolley controller PLC IM151/8-F PN
Communication via Leak wave (RCOAX)
Assembly Shop modification SVW CP3
Exchange 64 LJU trolley controller
One Test line at the customers workshop
Several modifications for Lifter and Push skid Line
Add 7 new Safety light barriers “Entry-Exit” at the push skid line
Door Sealing Station FAW VW Foshan
1 PLC S7-319-F
Pre-commissioning at the customer site in Germany 
Door Sealing Stations SVW CP3
1 PLC S7-319-F
Pre-commissioning at the customer site in Germany
Move and rebuild the existing station
Rubber line AUMA Jinan
1 PLC S7-315
Site-management and commissioning
BDC GM Shenyang
3 PLC S7-319-F, 1 PLC S7-416-F
Design and Commissioning
Paint Shop FAW-VW Changchun
Conveyor System
9 PLC S7-416
Door Sealing Stations SVW CP6 Ningbo
1 PLC S7-319-F
Pre-commissioning at the customer site in Germany
Engine EMS FAW Changchun
1 PLC S7-317
16 Troleys with Lifting Hanger
BDC GM Wuhan
3 PLC S7-319-F, 1 PLC S7-416-F
Design and Commissioning
Extrusion Line Huaning Hubei
1 PLC S7-315
Site-management and commissioning

 

 
 
Realizacja:Hali-Spitzer Automation & Control Technoligy(shandong)Co.,Ltd.